What we do

Groundworks

J P Dunn Construction have an excellent track record of successfully completing projects at the high-risk groundworks phase incorporating:

· Remediation
· Substructure
· Demolition
· Drainage
· Excavation
· Site clearance
· Piling
· Basement box construction
· Waterproofing
· Top down construction

Many of these projects have been completed in the challenging environment of central London, with the inherent logistical challenges that this brings. Through early engagement, the company is able to provide expert advice on temporary works, methodology and programme. This, coupled with input on value engineered solutions ensures that projects are delivered at an optimum cost. Experienced and trusted teams, and ownership of a wide range of equipment places J P Dunn Construction in a strong position to deliver groundworks projects, time and time again, safely, and in line with quality and programme objectives.

 

RC frames

The company has successfully undertaken the construction of multiple RC structures over the years, ranging from the relatively simple to the hugely complex. The pre-contract team are able to advise on the best solutions to achieve both economy of build, high quality of finish, and best programme. Within the company portfolio are many examples of in situ frames incorporating:

· Precast elements
· Post tensioned structures
· Slipform cores
· Jump cores
· Traditional cores
· Towers
· Architectural concrete finishes

The company directly employs the experienced teams able to deliver these projects and has invested heavily in the formwork systems and equipment to allow our commercial offer to be competitive.

 

External Works & Paving

J P Dunn Construction have a long tradition of delivering high end hard landscaping projects. As well as traditional flagstones and paving, the company has excellent relationships with quarries and the expertise to deliver finishes in natural stones such as sandstone, limestone and granite. Recently completed projects on the Greenwich Peninsula and at Royal Holloway College provide perfect examples of the high quality of workmanship achieved against the backdrop of demanding timescales.