Toddington Manor

  • Client; Kingerlee
  • Value; £3m
  • A leisure building for the Tudor Manor
  • Bulk dig basement excavation which includes 25,000m3 of muck to form a new bund
  • Construction of pile caps, basement slab to SR1 and SR2 tolerances, swimming pool with waterproof concrete,
    underground drainage and services
  • Special finish concrete which include 10m high walls with interfaces between twin wall and insitu elements
  • 10m high ribbed RC roof slab over 750mm thick

Privacy Preference Center

Analytics

These cookies collect information in an anonymous form, including the number of visitors to the site, where visitors come from and the pages they visited, so that we can measure and improve the performance of our site, using a service provided by Google Analytics.

_ga

Strictly Necessary Cookies

This cookie is placed when you click ‘Accept’ on the cookie information warning bar that is displayed at the foot of our website and tells us you have given your consent to the use of cookies on our site and stops this message from appearing. A compliance cookie is also placed if you change your cookie preferences using the control panel on our website.

_gdpr