Toddington Manor

  • Client; Kingerlee
  • Value; £3m
  • A leisure building for the Tudor Manor
  • Bulk dig basement excavation which includes 25,000m3 of muck to form a new bund
  • Construction of pile caps, basement slab to SR1 and SR2 tolerances, swimming pool with waterproof concrete,
    underground drainage and services
  • Special finish concrete which include 10m high walls with interfaces between twin wall and insitu elements
  • 10m high ribbed RC roof slab over 750mm thick