Project stats

  • Client: Regal London
  • Value: £11m
  • Sector: Residential
  • Services: Groundworks

Project Overview

JP Dunn Construction were delighted to be awarded their first contract with Regal on the Fulton & Fifth project in Wembley. This large-scale residential scheme includes five apartment blocks and over 800 homes, interwoven with landscaped gardens, paved walkways, and a green corridor. The development also features retail units, shopfronts, and workspaces intended to support local creatives and independent businesses.

Project Details

Groundworks

JP Dunn delivered all substructure elements for the development, including:

Underground drainage

Pile caps

Ground beams

9,000m² of ground floor slab

1,500m² of suspended slabs

 

The project involved close coordination with PCE, who installed the pre-cast frame, on a site with particularly constrained access.

Gas & Waterproofing

A key component of the substructure involved installing a combined gas and waterproof membrane across over **15,200m²**, supplied by **Cetco**. This membrane was installed by JP Dunn’s own operatives and signed off by a third-party inspector.

Pile Cap

The largest pile cap on site measured 900m³ and was poured in a single day, marking JP Dunn’s largest single pour in its 25-year history.

The pour took 13 hours

Used low-carbon concrete containing 70% GGBS cement replacement

Employed two static pumps and one mobile crane pump

Total concrete poured: 14,200m³

Total reinforcement fixed: 2,300 tons