New Sutton Secondary School

  • Client; Willmott Dixon
  • Value; £6.9m
  • Largest secondary school in UK built to Passivhaus specification
  • Acting as the Principal Contractor for a duration of 24 weeks works.
  • Site set-up, enabling works inc. site haul roads, construction of pile caps for 2 no. crane bases.
  • Substructure works include underground drainage and services, RC foundations and beams, insulation, waterproofing and RC ground floor slab.
  • Superstructure works involve RC columns and 1st level RC slab. Return visit to complete external works.

Download Case Study

Privacy Preference Center

Analytics

These cookies collect information in an anonymous form, including the number of visitors to the site, where visitors come from and the pages they visited, so that we can measure and improve the performance of our site, using a service provided by Google Analytics.

_ga

Strictly Necessary Cookies

This cookie is placed when you click ‘Accept’ on the cookie information warning bar that is displayed at the foot of our website and tells us you have given your consent to the use of cookies on our site and stops this message from appearing. A compliance cookie is also placed if you change your cookie preferences using the control panel on our website.

_gdpr