CURRENT PROJECTS
|
|
|
|
| |
CONTRACT |
VALUE |
CLIENT |
REFERENCE |
| |
|
£ |
|
|
| |
Westgate Development, Aldershot
Groundworks and RC frame associated with town centre redevelopment
to create new Morrisons supermarket, Travelodge hotel, cinema, petrol
filling station and leisure units. Works comprise substructure foundations,
15,000m² ground floor post tensioned slab, retaining walls,
drainage, 278 highways works, installation of 20,000 litre fuel
tanks, external works.
|
5,600,000 |
McLaren Construction |
Steve Adams
01277 205 800 |
| |
Worthing New Pools, West Sussex
Grondworks, RC Basement and two storey structure comprising of a
new six lane, 25m competition pool, an indoor leisure pool with
flume and outdoor pool with health and fitness centre, café
and flexible studio space.
|
2,800,000 |
Morgan Sindall Plc |
David Shershall / Gerard Cox
01737 222321 |
| |
1 to 5, Lower George's St., Richmond
Groundworks & RC Frame. Includes sheet piling, temporary propping and
a four storey RC frame over basement on a confined site.
|
2,700,000 |
BAM |
Ron Cottrell
0207 713 6010 |
| |
Paris Gardens
Substructure and RC frame for new student residences and Central
School of Ballet comprising waterproof double basement, temporary
propping and RC structure.
|
2,500,000 |
McLaren Construction |
Stuart Potter
07767 739516 |
| |
Pembroke College, Oxford
Groundworks and RC frames to five buildings ranging between four
and five storeys. Also includes RC basement, insitu concrete frame,
supply and installation of precast stairs and Omnideck slabs.
|
2,200,000 |
Kingerlee |
Darran Gammon
01865 840 000 |
| |
Hanworth Trading Estate
Groundworks, drainage including permavoid, extrernal concrete, and
tarmac roads. Parking and concrete topping at 1st floor.
|
1,600,000 |
John Sisk & Son |
Mark Harrison
01727 875 551 |
| |
AJW Aviation Slinfold, Horsham
Groundworks, drainage and external hardstandings for new 8,500m2
warehouse. |
1,000,000 |
McLaren Construction |
Roy Jones
01277 205800 |
| |
Ironmonger Row Baths, EC1V
Substructure and RC frame package associated with refurbishment
of an existing Grade II listed Victorian baths. Works comprise underpinning,
construction of new RC pools and balance tanks, slabs, staircases,
concrete toppings and drainage. |
960,000 |
Wates Construction |
Mike Platt
01372 861 000 |
| |
Charles Street, W1
9m deep waterproof basement to infill site in central London, part
constructed by top-down construction with substantial underpinning
and temporary works. |
760,000 |
Deconstruct |
Paul Ford
020 7734 6655 |
| |
St. Anthonys College, Oxford
Groundworks, RC Frame and hardstandings to new school buildings.
|
725,000 |
Kingerlee |
Rob Cruickshank
01865 840 000 |
| |
Africa House, Holborn
Groundworks and RC frame.
|
650,000 |
BAM |
Kevin Sims
0207 713 8606 |
| |
John Billam Resource Centre, Kenton
Enabling Works Package including roads and sewers |
560,000 |
Wates Construction |
Tony Mulcahy
01582 400 171 |
| |
Finwell House Redevelopment, EC2A
Structural alterations to existing building comprising construction
of stair/lift core walls, infill slabs on metal decking and new
RC ground floor transfer slab and beams. |
540,000 |
Wates Construction |
Dominic Hattee
01372 861 000 |
| |
Pilot scheme for West Hendon Project
Groundworks for 8 houses
|
240,000 |
Barratt West London |
Peter Ulatowski
020 8232 3470 |
| |
|
|
|
|
|
 |